KUALA LUMPUR AIR TRAFFIC CONTROL CENTRE

36-Month Operational Manpower,
Training & Experience Projection

M0–M36 · September 2026

APArea Procedural59
ASArea Surveillance68
APSApproach Surveillance68
TARGETEach rating80

Projection Framework

Operations-first projection across AP, AS and APS integrating OJT progression, College movement, attrition and operational experience.

Operational floor

68 controllers per rating. Attrition may temporarily reduce a rating below this level.

Target

80 operational controllers for each rating.

Pathway

AP → AS → APS. Operational/OJT progression takes precedence over College scheduling.

Annual supply

MAVA up to 40 new staff annually; projection uses 20 KLATCC controllers per annual intake.

Training allocation

15 current-method + 5 Two-Stream.

Attrition

3 controllers every 12 months, deducted from APS for projection purposes.

Monthly Operational Manpower Progression

First common target month: M34AP 84 · AS 83 · APS 82
Full M0–M36 table

AS College Waiting Time

AP-rated month → AS College start. Range 12–14 months; average ≈13 months.

APS College Movement

Five groups × 3 controllers. C5 extends beyond M36.

Experience Criteria Split by Rating

Meets both ≥2 years since first rating AND ≥6 months on current rating.

Full M0–M36 criteria table
AP maturity: I1 first 10 M4→M28 · next 5 M6→M30 · I1 G2 M10→M34. Intake 2 and 3 do not reach the 2-year threshold within M36.

6-Month Current-Rating Experience Split

Rated Mx is <6m through Mx+5 and ≥6m from Mx+6.

Full M0–M36 rating-experience table

Rating Definitions

AP

Area Procedural

AS

Area Surveillance

APS

Approach Surveillance